|
|
|
|
|
|
Optimize Schedule in M-Stage Flow Shop Problem Including Job Block Criteria using Fuzzy Index Function Dr. Tyagi Arti Assoc. Professor, Mathematics, M.M. University Sadopur-Ambala, email: artityagi.as@gmail.com Online published on 31 August, 2017. Abstract In the present study, we explore a new heuristic technique to a general flow shop scheduling in which proceeding times of jobs are in uncertain parameter considered to be in triangular fuzzy number. The job block concept has also been added due to relative importance of one job on other. The method is new one in the sense that it finds the near optimal sequence of jobs without converting the fuzzy processing time to classical numbers. A numerical example has been illustrated to demonstrate the purposed technique. Top Keywords Triangular fuzzy number (TFN), Fuzzy processing time, Flow shop, Fuzzy ranking, Location index etc. Top | |
|
|
|
|
║ Site map
║
Privacy Policy ║ Copyright ║ Terms & Conditions ║
║
|
|
860,817,718 visitor(s) since 30th May, 2005.
|
All rights reserved. Site designed and maintained by DIVA ENTERPRISES PVT. LTD..
|
Note: Please use Internet Explorer (6.0 or above). Some functionalities may not work in other browsers.
|